250819006269 - THE APPLICATION FOR THE ENVIRONMENTAL CLEARANCE CERTIFICATE FOR THE OPERATION AND MAINTENANCE OF AN EXISTING DETMOND – KUTAKO ELECTRICAL RETICULATION SYSTEM INCLUDING DETMOND SUBSTATION AND OTHER ASSOCIATED INFRASTRUCTURES.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Detmond – Kutako electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The Detmond - Kutako electrical reticulation system route runs north-eastwards, from Detmond Substation to Kutako substation located at Hosea Kutako (Windhoek International) Airport where the backbone for this route ends in Khomas region. This electrical reticulation system has a total length 3.1 km and is constructed with wooden structures. This ECC includes Detmond substation. Detmond Substation covers a footprint of about 1 456 m².

Commenting of the public on this project will expire at 12h00 on the 2025-09-18

Projects Documents

Please provide your comments below.

For further information contact:

Ministry of Environment and Tourism

Department of Environmental Affairs

(+264 -61) 284 2701 (T)

(+264-61) 240 339 (F)

http://www.met.gov.na