250409005665 - THE APPLICATION TO RENEW THE ENVIRONMENTAL CLEARANCE CERTIFICATE FOR THE OPERATION AND MAINTENANCE OF THE EXISTING 66KV OSONA – OKAHANDJA TRANSMISSION LINE INCLUDING OKAHANDJA SUBSTATION AND ONGEAMA SUBSTATION AND OTHER ASSOCIATED INFRUSTRUCTURES.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Osona – Okahandja transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Osona – Okahandja line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This ECC also includes Okahandja Substation and Ongeama Substation. The 66kV Osona – Okahandja powerline was constructed in 1978 and is 24.8 km in length. This powerline run from Osona substation to Okahandja substation in Otjozondjupa Region. Okahandja and Ongeama Substations cover a footprint of about 1 415 m² and 563² respectively. The powerline has towers made of wooden (kamarad) 5 poles structures. Figure 1 shows the locality map for the 66kV Osona – Okahandja transmission line.

Prpject status APPROVED

For further information contact:

Ministry of Environment and Tourism

Department of Environmental Affairs

(+264 -61) 284 2701 (T)

(+264-61) 240 339 (F)

http://www.met.gov.na