250408005648 - THE APPLICATION FOR THE ENVIRONMENTAL CLEARANCE CERTIFICATE FOR THE OPERATION AND MAINTENANCE OF AN EXISTING KARAS T-OFF – KARASBURG ELECTRICAL RETICULATION SYSTEM INCLUDING KARASBURG OTHER ASSOCIATED INFRASTRUCTURES.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 22kV Karas T-off – Karasburg to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The powerlines from this reticulation system run from Karas T-off substation southwards to Karasburg Substation, Karasburg area, Warmbad substation and various supply points in //Karas region. The reticulation system has a total length 157.3 km and is constructed with wooden structures. This ECC includes Karasburg and Warmbad substations. The Karasburg and Warmbad substations cover a footprint of about 143 m² and 5 861 m² respectively.

Prpject status APPROVED

For further information contact:

Ministry of Environment and Tourism

Department of Environmental Affairs

(+264 -61) 284 2701 (T)

(+264-61) 240 339 (F)

http://www.met.gov.na