The Construction and Operation of • A water abstraction, purification and storage plant at Kongola • Bulk water line between Kongola and Singoveka village (113km) • Approximately 33 new water offtake points with private consumer installations. • In the Zambezi Region.
Prpject status APPROVED
Ministry of Environment and Tourism
Department of Environmental Affairs
(+264 -61) 284 2701 (T)
(+264-61) 240 339 (F)
http://www.met.gov.na