The ECC is for the upgrade and operation of the existing Lithops Transmission Substation and proposed Battery Energy Storage SYSTEM (BESS) .The substation is situated roughly 1.5 kilometers from the B2 main road, adjacent to the access road leading to the Husab Mine.
Prpject status APPROVED