The ECC for the township establishments will cover the following key listed activities: Public Roads & Road Alignment (Section 10.2) Route Determination & Road Design (Section 10.1(b)) Construction of Canals & Channels (Section 8.4) Construction in Watercourses within Flood Lines (Section 8.8) Bulk Supply Pipelines (Oil, Gas, Water) (Section 10.1(a)) Electrical Cables & Infrastructure (Section 10.1(f))
Prpject status APPROVED
Ministry of Environment and Tourism
Department of Environmental Affairs
(+264 -61) 284 2701 (T)
(+264-61) 240 339 (F)
http://www.met.gov.na